Logo von Life IRISLogo von Life IRISLogo von Life IRISLogo von Life IRIS
  • Project
    • Goals of the IRIS project
    • Project phases
    • GE-RM
  • Pilot Regions
        • Danube
          • Resumee Preliminary Study Danube and Lower Traun
        • Isel-Drau
          • Resumee Preliminary Study Isel – Drau
          • GE-RM Isel – Drau
        • Enns-Salzburg
          • Resumee Preliminary Study Enns Salzburg
          • GE-RM Enns – Salzburg
        • Enns-Styria
          • Resumee Preliminary Study Enns – Styria
        • Lafnitz
          • Resumee Preliminary Study Lafnitz
        • Leitha
          • Resumee Preliminary Study Leitha
          • GE-RM Leitha
        • Pielach
          • Resumee Preliminary Study Pielach
          • GE-RM Pielach
        • Traun
          • GE-RM Traun
  • Monitoring
    • Monitoring
  • Project partners
    • Project partners
  • EN
    • German

Article in the Niederösterreichische Nachrichten on the Pielach pilot project

An article by Nadja Straubinger was published on 10th of February 2021 on the planning process in the Pielach project area, which runs from the confluence with the Danube upstream to the confluence with the Nattersbach at river kilometre 59.3.

Read more (article on NÖN.at)

Ähnliche Beiträge

Gruppenbild mit Landesrat Mag. Heinrich Dorner.

13. September 2021

Water experts networked on the topic of “Leitbild” (guiding principles)


Weiterlesen
Flussabschnitt der Leitha in Katzelsdorf
2. February 2021

Water protection plus


Weiterlesen
27. October 2020

Visit of the EU Monitoring Team to the IRIS Project


Weiterlesen
© 2021 IRIS
  • Imprint
  • Privacy Policy
  • Contact
  • EN
  • German